Emergency Cofferdam Water Retaining Fast Construction Economical Cost Full Solution Custom Vessel Jack-up Platform
Contact Supplier
Product Highlights
- High homework stability, stable pile leg support, able to adapt to harsh sea conditions.
- High homework efficiency, with fast lifting function, can be used in waters ranging from tens of meters to tens of meters deep.
- Strong flexibility, reusable, large deck space, and efficient lifting capability.
- High safety performance, good positioning ability and emergency avoidance capability.
- Convenient transportation, modular production, can be loaded into containers, and can be quickly assembled and put into use in a short period of time.
- Super heavy load deck, suitable for placing all kinds of large heavy equipment.
- Jack-up design isolates wave impact, keeping stable operation at sea.
- Adjustable high-strength legs adapt to different water depth and seabed conditions.
- Synchronous lifting control system prevents platform tilting under heavy load.
- Modular structure for convenient transportation and fast on-site assembly.
Product Attributes
- Customization
- Available
- After-sales Service
- 1year
- Warranty
- 1year
- Model NO.
- HD-PT36
- Hull Material
- Steel
- Customized
- Customized
- Certification
- CE, ISO
- Max Pay Load
- ≤5000t
- Self Propelled
- Customizable
- Type
- Customizable
- Condition
- New
- Length (Feet)
- Customizable
- Material
- Steel
- Length
- 36.60m
- Width
- 27.40m
- Mold Depth
- 2.8m
- Free Deck Area
- 910m2
- Max Load
- 350t
- Deck Strength
- 15t/M2
- Spud Leg Height
- 58.0m
- Spud Leg Diameter
- 1.90m
- Top-Mounted
- Hydraulic & Mechanical Locking
- Jacking Speed
- 18m/H
- Jacking Stroke
- 1.22m
- Lifting Capacity
- 600t Per Spud Leg
- Operating Wave Height
- 3.0m
- Operating Wind Speed
- 50km/H
- Transport Package
- Container/Bulk Shipping Transportation
- Specification
- 36.60*27.40*2.80m
- Trademark
- Haiding Shipyard
- Origin
- Qingzhou Weifang Shandong Province
- HS Code
- 89051000
- Production Capacity
- 5000ships/Year
- Package Size
- 1219.20cm * 243.80cm * 289.60cm
- Package Gross Weight
- 26000.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Emergency Cofferdam Water Retaining Fast Construction Economical Cost Full Solution Custom Vessel Jack-up Platform
Find Similar Products
Product Description


Model: | HD-PT12 | HD-PT22 | HD-PT30 | HD-PT36 |
Length: | 11.80m | 22.0m | 30.5m | 36.6m |
Width: | 11.80m | 18.0m | 18.3m | 27.4m |
Mold Depth: | 1.5m | 2.0m | 2.2m | 2.8m |
Free Deck Area: | 80 square meter | 322 square meter | 520 square meter | 910 square meter |
Max Load: | 30T | 100 T | 150 T | 350 T |
Deck Strength: | 3T/m² | 15T/m² | 15T/m² | 15T/m² |
Positioning Pile Height : | 35.0m | 35 m can be extended | 35.0mcan be extended | 58 mcan be extended |
Positioning Pile Diameter: | 0.48m | 0.72m | 1.22m | 1.90m |
Lifting Method: | Hydraulic/mechanical locking | Hydraulic/mechanical locking | Hydraulic/mechanical locking | Hydraulic/mechanical locking |
Jacking Speed: | 22m/h | 22m/h | 12m/h | 18m/h |
Lifting Stroke: | 1.20m | 1.20m | 1.22m | 1.22m |
Lifing Capacity: | 40 T per spud | 40 T per spud | 300 T per spud | 600 T per spud |
Working Wave Height: | 1.0 m | 1.0 m | 3 m | 3 m |
Working Wind Speed: | 25km/h | 25km/h | 50 km/h | 50 km/h |
Working Seawater Velocity: | 1m/s | 1m/s | 1m/s | 1m/s |
Max Working Wave Height: | 30.0m | 30.0m | 5 m | 5 m |
Max Working Wind Speed: | 1.5 m | 1.5 m | 120 km/h | 120 km/h |
Max Working Seawater Velocity: | 54km/h | 54km/h | 1m/s | 1m/s |
Model: | HD-PT55 | Model: | |
Length: | 55.5m | Length Overall: | 60.0m(Include parking apron) |
Width: | 32.2m | Breath: | 45.0m |
Mold Depth: | 3.5m | Free Deck Area: | 2200 square meter |
Draft : | 2.4m | Length: | 45.0m |
Free Deck Area: | 1000 square meter | Depth: | 6m |
Deck Crane Capacity: | 100T,Radius 22m/22T,Radius 60m | Draft : | 4.6m |
Crane Arm Length: | 6 0 m | Max Load: | 1000 T |
Helicopter Deck: | 19.5mDiameter | Deck Capacity: | 15–25 T/m² |
Deck Capacity: | 9.3T | Winch: | 4x 500m, 30T |
Winch: | 4×30T Pulling (500m) Electric power | Anchor: | 4 sets |
Anchor: | 4set Delta Anchor,Weight5T | Positioning Pile Height: | 80.0 m (4sets 20.0 m),(max100.0 m) |
Positioning Pile Height: | 78.85m | Positioning Pile Diameter: | 3.6m |
Positioning Pile Diameter: | 3.0m | Lifting Speed: | 1 m/min |
Lifting Speed: | Per supd 2000T, Max 0.4m/min | Bearing Capacity: | 1360 T Per Spud |
Max Load: | 800T | Braking Bearing Capacity: | 2450 T per spud |
Working Wave Height: | HS1.5m/5s | Working Depth: | 40.0 m(The height of the positioning pile can be increased) |
Working Wind Speed: | 8m/s | Working Wave Height: | 7.5m |
Max Working Wave Height: | 14.7m/12.5s(Aie Gap 13.5 m) | Working Wind Speed:: | 20.0m/s |
Max Working Wind Speed: | 39.0m/s | Limit Water Depth: | 45.0 m (The height of the positioning pile can be increased) |
Max Working Wave Height: | 15.0m | ||
Max Working Wind Speed: | 35.0m/s |










A: Payment can be paid in T/T.30% T/T in advance, 40% T/T after engine installation, 30% T/T before shipment.
About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI255816". Items marked "" are certified.
Company Profile
Shandong Haiding Shipbuilding Co., Ltd.
As a veteran shipbuilder with over 30 years of experience, Shandong Haiding Shipbuilding Co., Ltd. Has consistently pursued innovation-driven development and market success through quality excellence. In 2021, the company completed strategic restructuring, recruiting more than 20 senior technical professionals and achieving an annual output value exceeding 80 million RMB, marking a milestone in our leapfrog development.
Our Competitive Strengths:
Secured 7 major shipbuilding projects in recent three years with total contract value surpassing 200 million RMB
Owns 1 registered trademark, 4 patents and 3 software copyrights
Holds 8 international certifications and 3 special equipment production licenses
Products exported to 132 countries/regions, with annual export volume steadily exceeding 50 million RMB
Demonstrated excellence in international projects including Far East dredging operations in Russia and port construction in Philippines
Headquartered in the historic city of Qingzhou, Shandong, our modern production base covers 59, 400 square meters. Main product lines include:
Engineering Vessels:
Dredgers, Backhoe Dredgers, Floating Pump Stations, etc.
Transport Vessels:
RO-RO Ferries, Multi-functional Transport Ships, etc.
Specialized Vessels:
Offshore Lifting Platforms, Improved Pontoon Bridges, Fishing Vessels, etc.
Our products have been widely applied in major projects along the Belt and Road Initiative, including port construction, channel dredging and offshore wind power, forming comprehensive engineering vessel solutions.
R&D Capabilities:
15-senior engineer-LED R&D team
Pioneered "100-Meter Modular Land Transport Technology", successfully applied in overseas projects, reducing construction period by over 40%
New intelligent production line launched in 2023 increased capacity by 30%, enabling annual delivery of 20+ vessels
Future Development:
We plan to invest 50 million RMB to establish an R&D center focusing on green shipbuilding technologies. We look forward to deepening cooperation with global clients, committed to "Zero Defect in Quality, Zero Complaint in Service", providing one-stop shipbuilding solutions from design to after-sales.
Choosing Haiding Means Choosing:
1.30 years of professional shipbuilding experience
2.80 million RMB annual output ensuring scale advantage
3. Successful cases in 132 countries
4. Innovative modular construction technology
We cordially invite partners worldwide to visit and jointly create a new blueprint for marine economy development!
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- Qingzhou, Weifang, Shandong, China
-
Plant Area
- 12233 square meters
-
Number of Employees
- 33
-
Registered Capital
- 28,500,000 RMB
- Terms of Payment
- T/T
- International Commercial Terms(Incoterms)
- FOB
-
Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months -
Nearest Port
- Qingdao Port
-
Minimum Order Quantity
- 1 set
Our Production Capability & Technical Expertise
-
Main Products
- Cutter Suction Dredger, Gold Dredger, Jet Suction Dredger, Multi-Functional Working Ship, Deck Barge, Transport Ship, Offshore Lifting Platform, Tugboat
-
Production Lines
- 1
-
Production Machines
- Welding Machine, Punching Machine, Drilling Machine
-
QA/QC inspectors
- 1 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instruction but no written records
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 1 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2021-06-18
- Export Year
- 2021-06-18
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
-
Repeat Buyers Choice
- 30%~50%
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- No
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015, ISO14001, ISO45001:2018, ISO50001
-
Cooperated with Fortune 500
- No
FAQ
- Why choose Haiding company?
- As a direct dredger manufacturer, we specialize in custom design and production of dredging equipment (including sand dredgers, gold mining dredgers, water intake ships) and mining equipment. Our innovative modular transport solution significantly reduces shipping costs for clients. All engineering ships deliver reliable quality with competitive pricing - offering true cost efficiency without compromising performance.
- What advantages does Haiding Ship have?
- Haiding specializes in engineering ship manufacturing, rich experience in jack-up platforms, strong customization capacity, exported to Africa, Southeast Asia, Middle East.
- What's the warranty?
- We provide 12 months warranty on all new installed components, new engine, hull and all fabricated parts.
- Can the dimensions of the pontoon be customized?
- Full customization is available for length, width, height, deck load capacity and overall layout. Designed and built in modular form in accordance with shipbuilding standards and customer requirements, it fully meets transportation and on-site installation requirements while saving freight costs.
- What about the payment terms?
- Payment can be paid in T/T.30% T/T in advance, 40% T/T after engine installation, 30% T/T before shipment.
- After-sales service for overseas clients?
- Operation training, remote technical support, spare parts supply, optional overseas on-site commissioning.
- What seabed types can this platform adapt to?
- Suitable for sand, silt and clay seabed; enlarged spud cans available for soft mud ground to prevent sinking.
- What main application scenarios are your platforms used for?
- Widely used for river dredging, gold mining, piling construction and water engineering operation.
- What material is the platform hull made of?
- Marine high-strength steel with multi-layer anti-corrosion paint, long service life in seawater.
- Can you supply complete export certification documents?
- Yes, we can provide all customs clearance and vessel inspection documents for overseas shipment.
- What is your warranty period for the platform?
- 12-month warranty for hydraulic system, electric control and spud legs; whole structure long-term technical support.
- Does the platform support one-button lifting control?
- Yes, equipped with integrated electric control cabinet for easy centralized operation.
- Can we add living quarters on the platform?
- Yes, crew accommodation, rest room and storage cabin can be customized on demand.
- Can you send technical drawings for quotation first?
- We can provide layout drawing and quotation after knowing your working conditions.
- How many spud legs can you design for the platform?
- 3 legs, 4 legs or multi-leg structure can be designed as per load requirement.
Send your message to this supplier
People who viewed this also viewed
-
US$50,000.00-120,000.00 / Set
-
US$150,000.00-620,000.00 / ship
-
US$50,000.00-100,000.00 / Piece
-
US$110,000.00-300,000.00 / Set
-
US$100,000.00-200,000.00 / Set
Find Similar Products By Category
- Supplier Homepage
- Products
- Jack Up Barge
- Emergency Cofferdam Water Retaining Fast Construction Economical Cost Full Solution Custom Vessel Jack-up Platform
Related Categories
Hot Searches
- Pick Up Truck Factories
- Container Unit Factories
- Pallet Jack Factories
- Service Jack Factories
- Transportation Platform
- Platform Vehicle
- Transport Platform
- Cargo Platform
- Platform Pallet
- Jack up Platform Bulkbuy